Peace River 01 Peace River Water Training Facility Project

Peace River Water Training Facility

Magnum built the new Peace River Water Quality and Training Facility located in Arcadia, Florida. This provided a new facility to house the operations and laboratory work for the Peace River Manasota Regional Water Supply Authority. This project included a new 6,600 square foot office building housing a state of the art laboratory, restroom facilities, and renovations to the existing office building (including adding an elevator to the existing 2-story building). The project was engineered as a "Hardened Structure" to ensure the facility is capable of operating during a hurricane. The project design incorporated numerous LEED Design Elements throughout the facility. The project included curtainwall/storefront window/door systems, split-face masonry block, chemical resistant plumbing systems, chemical seperation tank system, grease trap, elevator, storm sewer, force main, and a new lift station.

This project was completed ahead of schedule for a total cost of $2 million. Magnum Builders was able to return a total of $27,263.10 in contingency savings to the Owner.