Scheduling
Preparing the schedule for the project will include material lead times, manpower requirements for trades, and weather (time of the Florida year) affects. It begins with the Client’s requirements for completion and will be assembled to include Design and Preconstruction, Pricing and Contracting, and Construction. All of these tasks are assembled into a Critical Path Method (CPM) schedule that will serve to manage the entire process from start to finish.