Magnum Builders provided Construction Management services to construct this project. The Project consists of construction of two new fabric crosswalk canopies in front of the ticketing and bag claim wings of the terminal building, construction of new fabric canopy along the parking lot curbside, removal of the 10’ concrete median in the center of the curbside roadway, reconstruction of the concrete roadway, construction of security bollards between the terminal building and the curbside roadway, and installation of protective film on all windows on the first floor of the terminal building which face the curbside roadway. Also included in the project is utility rehabilitation and reconfiguration (storm, sewer, and water), roadway lighting, in-pavement crosswalk warning lights, canopy lighting, electric vehicle charging stations, landscaping, milling and overlay of the asphalt pavement, signage and pavement markings.
Magnum Builders' Impact to the Success of the Project:
The project required performing all phases of construction at the most busy portion of the airport, the Curbside of the Terminal and Baggage Claim Areas of the Airport. SRQ Airport receives over 1-Million customers in a 1-year period and Magnum was required to perform the construction without any disruptions to the airport operations. We were able to do this with carefully planned phasing of the work, and performing work at nights (and day shifts). The project was a huge success and did not disrupt any of the airport operations or airport patrons throughout the entire duration of the project.